Blackwell architecture
HS-Series

Blackwell-tuned AI workstations,
validated for sustained runs.

Helmstone Systems builds pre-configured rigs around RTX 5090, RTX Pro 6000, and B200 accelerators — burned in for 48 hours against the workload you actually bought it for, shipped with a per-unit benchmark, and covered by on-site service.

Building an AI startup? Explore workstation options for model teams →

Street price, RTX 5090
$1,999 – $2,599
Street price, RTX Pro 6000
$8,500 – $10,500
Helmstone integrator premium
25 – 35% over DIY parts cost

Unit datasheet / HS-5090-W1

Burn-in: PASS
Helmstone W1Workstation · single node
Accelerator
1× NVIDIA RTX 5090 · 32 GB GDDR7
Host memory
256 GB DDR5-6400
Storage
4 TB NVMe
Validation
Workload-specific 48-hour burn-in
Commercial path
From $6,400 · hosted card checkout
Service tier
On-site · 5-business-day swap
See the full lineup →

Burn-in window

48 hours

Workload coverage

Per-SKU

Service metros

5 priority regions

Per-unit benchmark

Published, signed

HW-01 / Catalog

Four systems, with the buying path made explicit.

W1 is the only published fixed-price card path. W2, W4, and RS remain approval and quote workflows while their final commercial details are pending.

HW-02 / Validation

The 48-hour burn-in is engineering, not theater.

Every unit runs the workload it was sold for — not a synthetic stress test — for two full days, with thermography and per-GPU telemetry sampled throughout. The result is a benchmark sheet that ships with the hardware and lives in our service portal for the life of the unit.

Step 01

Spec review

Pre-sales engineer locks the SKU to the actual workload — model class, batch shape, expected duration.

Step 02

Burn-in loop

Workload-specific driver + model stress runs for 48 hours at target utilization. Tail-latency, clocks, and VRAM thermals logged per minute.

Step 03

Thermography

Infrared sweep at peak load. Hot-spot map attached to the unit datasheet; chassis airflow tuned if delta exceeds spec.

Step 04

Sign-off

Engineer signs the per-unit benchmark. Unit is sealed, logged, and routed to regional service depot for delivery.

Validation record · SKU-specific output

Signed validation, tied to the workload.
Each system receives a workload-specific record after its validation window. The final configuration and measured figures are confirmed with the buyer.
Workload
Buyer-specific model and run profile
Throughput
Measured across the full validation window
Tail latency
Logged under sustained target utilization
GPU thermals
Per-accelerator telemetry recorded
VRAM utilization
Recorded against the configured workload
Power envelope
Measured against the final chassis
Verified by
Helmstone pre-sales engineering

Thermography · 30-minute mean

Peak-load behavior, documented.
The validation record includes thermography and per-GPU telemetry for the selected configuration. Published figures are tied to the buyer's system and workload.
Record
Per SKU
Window
48 hours
Output
Signed

HW-03 / Workload coverage

What the burn-in is actually exercising.

The metric we publish on each datasheet is one a real customer cares about — not a peak number that a five-minute stress run can hit. We pick the metric that decides whether the next day of work makes progress.

p99 tokens/sec

Multi-day LLM inference

Sustained token throughput on 70B–120B models, with KV cache pressure and tail latency measured across the burn-in window.

tokens/day · gradient stability

Frontier fine-tuning

LoRA, full-parameter, and continued pretraining runs sustained through checkpointing and optimizer state shuffle.

frames/sec · MFLOPS sustained

Video + scientific sim

Diffusion workloads and CFD/EM solvers held at target utilization, with thermal headroom verified against job profile.

HW-04 / Why Helmstone

The integrator premium
is the product.

The 25–35% uplift over DIY parts cost is what a researcher or an IT lead chooses to pay in a constrained 2026 market, in exchange for engineering time, supply allocation, and named accountability. We are not a retailer, and the margin does not fund one.

Per-sale margins of $1,000–$5,000+ fund a small bench of pre-sales engineers and field technicians. The moat is configurator depth, sustained-load thermal validation, and on-site coverage in priority metros — not SKU breadth.

See how Helmstone compares to DIY parts →

Supply access

Dedicated channels in a market where TSMC 4NP allocation favors hyperscalers. We do not rely on the same retail channels you do.

Workload-locked SKU

A pre-sales engineer picks the configuration that wins for your job. Configurator depth, not configurator breadth.

48-hour burn-in

Per-unit, workload-specific, with a signed benchmark. Not a five-minute stress test that any retail unit could pass.

On-site service

Five priority metros today: Bay Area, Boston, Research Triangle, Austin, Seattle. Pickup within 24 hours, depot validation, return or swap in five business days.

HW-05 / Frequently asked

The questions pre-sales
actually hear.

If the answer you need is not below, talk to an engineer. The longer list lives at /faq.

HS-CS-00 / Latest case study

What buyers actually deployed,
paraphrased inside the published envelope.

The published case studies walk through buyer profile, configuration purchased, validation evidence with linked proof, and what the deployment looked like — every quantitative claim traced back to the canonical 48-hour burn-in.

Read the AI lab study →All case studies →

HS-CS · University AI research lab

Anonymized
How a university AI research lab shipped a 72-hour LoRA fine-tune on its grant cadence.
Small lab team, 7B–13B instruction-tuned base models through LoRA and checkpointed full-parameter fine-tunes on the Helmstone W1 — anonymized, internally consistent, paraphrased inside the published single-RTX-5090 burn-in.
Workload
LoRA + full-parameter fine-tunes · 7B–13B base models
Tier SKU
HS-5090-W1
Run duration
~72–96 hours / fine-tune · weekly cadence
Throughput envelope
Inside published worst-hour tok/s
Junction temperature
Max 79 °C · 30-min mean ≤ 72 °C
Wall-meter watts
≤ 612 W · clean PD envelope

Read the full study →

HS-06 / Engage

Spec a build, or read the burn-in
that proves it.

Every order begins with a pre-sales engineer. If your team is buying a single workstation or equipping a research lab, write to us with the workload — model class, expected duration, batch shape — and we will return a configuration, a benchmark target, and a quote.

Read the FAQ →

What to include

To get a configuration in one round-trip:
  • 01.Model class and size (parameters, tokenizer, context length)
  • 02.Expected job duration per run, and runs per week
  • 03.Site location and preferred service metro
  • 04.Procurement vehicle (PO, grant, capital)

Reply within one business day, signed by an engineer with a configuration and a benchmark target.