Service area
HS-SA / Coverage

HS-SA-01 / Where the engineers live

Where the on-site
engineer is already on the calendar.

Eight US metros carry a Helmstone engineer on the calendar — no dispatch lag, P1 tickets turn into a truck on the road before the four-hour window closes. Outside those metros the contract still covers, but the order of operations shifts: remote mitigation first, on-site second.

Map last reconciled ; cross-references the SLA on /support (last updated ).

HS-SA-02 / Coverage map

Eight metros on the calendar.
Everything else, remotely first.

Click a pin to open the local-team contact and the on-site response windows. Geography is illustrative — the dot is the claim, not the tile.

Contiguous US · priority metros

Priority metro · 8Non-priority · worldwide fallback
Helmstone priority service area — eight Tier-1 metrosStylised tile map of the contiguous US. Eight Tier-1 metros (San Francisco Bay, Greater Seattle, NYC metropolitan, Greater Boston, Austin, Greater Los Angeles, Greater Chicago, Washington DC metropolitan) are pin-marked with engineer headcounts; all other regions fall under the worldwide Tier-2 fallback.MEVTNHWAIDMTNDMNWIMINYMARIORNVWYSDIAILINOHPANJCTCAUTCONEMOKYWVVAMDDEAKAZNMKSARTNNCSCDCHIOKLAMSALGATXFL6San Francisco Bay Area3Greater Seattle5New York City metropolitan4Greater Boston3Austin3Greater Los Angeles3Greater Chicago2Washington DC metropolitan

Tile shapes are an illustration, not a survey. The dots and engineer counts are the contract — the same numbers back the metro cards below and the priority-metro list on /support.

Selected metro

San Francisco Bay Area

CA · North America · Tier 1

North America · Tier 1

San Francisco Bay Area
On-site · 6 engineers

On-site burn-in validation, RMA swap-out, and field servicing for purchase orders and fleet rollouts across the Bay.

Local team contact

Field Service Lead · SF Bay Area

6 engineers on the calendar

Mon–Fri, 08:00–18:00 PT · 24/7 P1 paging

P1
Thermal fault, system down

Same-day, on-site engineer dispatched within 4 business hours.

P2
Performance regression

Next-business-day remote triage; on-site if root cause is hardware.

P3
Driver / firmware request

Scheduled within the next qualified update batch (usually weekly).

HS-SA-02b / Priority metros

One engineer on the calendar in each metro.

Same SLA wording as the matrix on /support, with the on-team engineer count and weekly hours added per metro. P1 thermal faults hit on-site within four business hours; P2 performance regressions triage remotely first and go on-site when the root cause is hardware.

HS-SA-03 / Worldwide fallback

Outside the priority metros,
the contract still covers.

The SLA does not end at the Tier-1 border. Remote mitigation in 48 hours, parts shipped the next business day, and on-site within 72 hours if the workaround cannot hold — that is the contract for every other US and EU site we have shipped to.

HS-SA-03 / Worldwide · Tier 2

Remote first. On-site when remote fails.

Direct engineering contact within four business hours. Workarounds run over a secure remote channel — diagnostics, driver pinning, thermal logging — and the depot cross-ships a qualified replacement if the unit cannot be returned to spec within five business days.

  • 48hRemote mitigation. A workaround the buyer can stage without a truck roll.
  • NBDNext-business-day parts. Spare GPU, host memory, storage, PSU, and chassis-fan kits ship the next business day from the closest depot.
  • 72hOn-site second.If remote mitigation cannot hold, an engineer is on the road — typically within 72 hours, capped at the next engineer tour into the buyer's region.

HS-SA-04 / Cross-link

The map is one page in three others.

The on-site footprint is constant — it is what every Helmstone workstation ships with. The map is the geographic face. The SLA is the contract. The catalog is the class of machine. The quote is where engineering reads your inputs and writes back.

HS-SU / Support & SLA

Read the SLA end-to-end.

Priority × metro windows, the technician footprint, the seven SLA clauses that ship with the quote.

Go to /support →

HS-LU / Tiers

Pick the right class of workstation.

Four SKUs pinned to a workload class — each starting price, headline spec, and the job the burn-in is actually exercising.

Go to /tiers →

HS-QT / Quote

Send the four inputs an engineer needs.

Model class, expected job duration, service metro, and procurement vehicle — engineering replies within one business day.

Open the quote form →

HS-SA-05 / Engage

Not in a priority metro?
Write to engineering anyway.

The map is the headline, but the contract is the same everywhere we ship. Tell us your site location, model class, and expected job duration — engineering replies within one business day with the priority-metro assessment and the worldwide Tier 2 fallback that applies.

Talk to engineering

Send the four inputs an engineer needs.
We respond within one business day, signed by a pre-sales engineer with the metro assessment and a quote.