Facilities calculator
HS-PC / Room-fit

HS-PC-FIT / Sustained load + room fit

Will this fit
in your room?

Drag the workload sliders, then read the steady-state watts, the BTU/hr cooling load (in tons), the recommended circuit (120 V vs 240 V single-phase with the right breaker), the UPS headroom, and the rack PDU SKU — in one click. Pure client-side math, no backend round-trip.

HS-PC-RUN / Fit

Drag the sliders. Read the row.

The math is hard-coded in the page tier-by-tier, against canonical W1=650 / W2=612 / W4=4800 W wall draw — the same watt row the existing /calculator returns. Two sliders (sustained load % of TDP, ambient room temp) and a tier picker; everything else derives.

Configuration

Will this fit in my room?
Pick a tier, drag the sliders to your workload profile, read the steady-state watts and the facilities-fit row on the right. Pure client-side math — no round-trip.
Tier
75% of TDP

Your workload's duty cycle, not the GPU's peak. 75 % is a typical training/inference sustained profile; 50 % is a heavier RL or a long fine-tune; 100 % is a worst-case stress test.

22 °C (~72 °F)

Inlet air at the rack. Datacenter cold aisle runs ~18 °C; office spaces run 22-26 °C; anything above 28 °C starts to materially heat-soak the chassis.

Fit

Computing…
For Helmstone W1 at 75% of TDP and 22 °C.
Steady-state Watts
—
Cooling load
—
Minimum circuit
—
UPS headroom
—
PDU suggestion
—

Methodology: Published 48-hour burn-in

Paste it into a facilities request

Facilities summary
Plain ASCII — round-trips through ticketing systems without losing the numbers.

HS-PC-HANDOFF / Hand-off

Fold it into the quote.

Once facilities has confirmed amps and cooling, the matching tier pre-fills on /quote with the same configuration the calculator just sized — so the sales engineer is already pinning the build to your envelope, not asking you to repeat yourself.

What this calculator pins

  • •Tier SKU and the citation for its watt row
  • •Sustained load as % of TDP — your workload duty cycle
  • •Ambient room temperature that drove the derate
  • •Recommended voltage choice (120 V vs 240 V single-phase) and breaker amps
  • •UPS kVA under the NEC 1.25× continuous-load rule
  • •Pinned PDU SKU (Raritan / Server Technology)
  • •Cooling load in BTU/hr and tons, ready to paste into facilities